What we do
Leaks, supply cuts, old or undersized pipes: Guadeloupe and Saint-Martin are making a major effort to renew their water networks. TMI carries out this work for water authorities and utilities, the Departmental Council, towns, the Port Authority and developers, from trench opening to commissioning.
We lay drinking water supply and distribution mains, wastewater and stormwater sewers, service connections with meter boxes, plus manholes, valve chambers and ancillary structures. Work is phased section by section to keep customers supplied and limit disruption for residents.
Every network is tested before commissioning: pressure tests and disinfection for drinking water, leak tests and inspection for sewers. Road reinstatement after trenching is done by our own asphalt crew, with no extra contractor.

- Drinking water supply and distribution
- Wastewater networks
- Stormwater networks
- Connections and meter boxes
- Ancillary structures
- Pressure testing and commissioning
Preparation
Detailed design, detection of existing utilities, phasing plan and information for residents.
Laying and testing
Laser-guided laying, controlled compaction, pressure testing, disinfection and commissioning.
Integrated reinstatement
Backfilling and asphalt reinstatement by our own crews.
References
Completed and ongoing projects
A selection of projects carried out by our crews for public clients in Guadeloupe and Saint-Martin.
- Water networksDrinking water supply renewal, Quay 6Guadeloupe Port Authority (GPMG)Guadeloupe€145,900 excl. VATIn progress
- Water networksWater main renewal and new sewer networkPublic water utilitySaint-Martin€886,557 excl. VATIn progress
- Water networksDrinking water network renewal in Sainte-Anne, Impasse VallierGuadeloupe Departmental CouncilGuadeloupe€195,971 excl. VATIn progress
- Water networksDrinking water network renewal in Saint-François, phase 1: Bragelogne and Saint-Charles areasGuadeloupe Departmental CouncilGuadeloupe€620,268 excl. VATIn progress
- Water networksBoreholes for drinking water supplyPublic water utilityGuadeloupe€897,195 excl. VATIn progress
Frequently asked questions
Your questions about this trade
Which clients do you work for?
Mainly public clients: SMGEAG, the Guadeloupe Departmental Council, the Guadeloupe Port Authority and public water utilities. We also consider requests from developers, businesses and private owners through our contact form.
Do you build water and sewer connections?
Yes. In the Cornet area of Petit-Canal we built 450 connections with meter boxes, alongside 6 km of drinking water mains and 6 km of sewers.
Do you work in Saint-Martin?
Yes. We are currently renewing a drinking water main and building a new sewer network there for the public water utility.
Who resurfaces the road after pipe works?
Our own crews. TMI has its own asphalt plant and crew (milling machines, pavers, rollers), so road reinstatement follows straight on without waiting for another contractor.
A project, a tender, a question?
Public bodies, engineers, businesses or individuals: describe your needs and we will get back to you.
Our other areas of expertise